TRANSPORTS

Rwanda

Consultancy services for developing fleet renewal program including transaction advisory and detail design for e-bus pilot project in the city of Kigali within the Rwanda Urban Mobility Project (RUMP)

Date : July 2023 – ongoing

Client: City of Kigali

Recognizing the potential for e-mobility to support national climate change mitigation objectives, the Gov.ernment of Rwanda (GoR) approved an electric mobility strategy for Rwanda in 2021 targeting 20% electrification of all buses by 2030 and several incentives for electric vehicles (EVs). To realize its bus electrification target, the GoR is prioritizing the electrification of bus services in Kigali, followed by inter-city services in the rest of the country. To overcome the high upfront cost and considering the limited financial capability of current private bus operators in Kigali, the study recommends that a dedicated entity such as an asset leasing company competent on operating leases for e-buses and charging solutions ( called “AssetCo”) be established to fund, procure and own electric buses, which are leased out to private operators.  

Objective of the Consultancy Services is to structure, institutional framework, detailed techno-commercial feasibility and roadmap for electric buses investment.  To develop and define the structure for an ebuses AssetCo and ecosystem (i.e. including associated depots, staging areas, charging infrastructure, electrical supply, operational processes, etc.) to drive electric bus investment and adoption in Kigali in a sustainable and scalable way. Once this is clearly defined, next step is to confirm detailed techno-commercial feasibility for a first phase of e-buses deployment and determine the technical specifications for e-buses and supporting infrastructure for this phase of e-bus deployment.  

Sector : Urban E-Mobility

Grenada

Design and Construction Supervision Consultancy Services for Runway End Safety Areas (RESA) at Maurice Bishop International Airport

Date : May 2023 – ongoing

Client: Ministry of Infrastructure Development and Implementation, Grenada.

The objectives of the Caribbean Regional Air Transport Connectivity Project (CATCOP-Grenada) are to improve the operational safety and navigational efficiency of transportation, increase the climate and disaster resilience of Maurice Bishop International Airport (MBIA) and climate/disaster resilience of associated infrastructures. The objectives of this Component of the Project are to improve MBIA’s operational safety and resilience and support Grenada’s efforts to comply with ICAO SARPs by the Design and Construction of Runway End Safety Area with enhanced drainage features.

Sector : Airports

Cambodia

Construction supervision consultant for 6 rural road sections with total length of 110.52 km within the Agricultural Value Chains Competitiveness And Safety Enhancement Project (ACSEP)

Date : February 2023 – ongoing

Client: Ministry of Rural Development Kingdom of Cambodia

Funding Institution: Asian Development Bank, JFPR Japan Fund, Agence Française de Dévelopement

Consulting Services for Construction Supervision to support the MRD and the Provincial Departments of Rural Development (PDRD) of the 6 target provinces on the construction of 6 rural road sections with total length of 110.52 km and associated infrastructures; secondary objectives are: (i) to strengthen the technical capacity of PDRD staff in construction management and site supervision, (ii) to improve road safety, and (iii) to monitor social and environmental aspects related to the ongoing construction.

Sector : Roads

Italy

Upgrading and refurbishment of MEBO Expressway section km 196,25 – km 197,30 in Lagundo Municipality (Bolzano)

Date: 2017

Client: Province of Bolzano – Ufficio Strade Ovest (IT)

Detailed Design and Tender documents of Enlargement of MEBO Expressway – section Km 196.250 to Km 197.300, Lot 2 (Bolzano Province).

South Sudan

Zeat Bead Feeder Roads Project

Date: 2015 – 2016

Client: UNOPS

Detailed Design & Tender Docs of Feeder Roads in the Greater Bahr el Ghazal Region: Gok Machar – Mayom Angok Road (34.7 Km), Achol Pagong – Ayien – Jong Lual – Panliet Road (38.5 Km), Kangi – Bar Urud Road. (29.5 Km)

Iraq – Kurdistan Region (KRG)

Proposal for a new Kurdish airline

Date: 2014

Client: Regional Government of Kurdistan (KRG)

Feasibility study to establish a National Airline as per IATA Rqst. Evaluations carried with Alenia – Sukhoi Superjet to define routes and ticket price for a Medium Range plane and comparison with DASH, Bombardier and Embraer similar planes based at Erbil Airport.

Sudan

Upgrading of Merowe Airport

Date: 2013

Client: Sudanese Min. of Transports – Vitrociset SpA (IT)

Preliminary Design of TWR & Apron rehabilitations (together with ENAV, Technosystem & Vitrociset)

Construction costs: 16 Mil US$

Saudi Arabia

Due Diligence for establishment of maintenance aviation company

Date: 2012

Client: Alenia SpA (IT)

Due diligence for the establishment of a newco in Rijadh for Alenia/Al Salam company for maintenance of Military C-130 and AWACS planes.

Construction costs: 14 Mil US$

Albania

By-pass of Tepelene e Gjrokaster – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date: 2009

Client: Bonifica SpA on behalf of Albanian Ministry of Roads (AL)

Hydrological studies and executive design of the drainage network and hydraulic works.

Albania

Tirana-Elbasan Highway – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date: 2009

Client: Bonifica SpA on behalf of Albanian Ministry of Roads (AL)

Hydrological studies and executive design of the drainage network and hydraulic works.

Vanuatu

Upgrading of Port Vila Airport

Date: 2008

Client: MNR (VAN) – Vitrociset SpA (IT)

Preliminary Study of the New Port Vila Airport for a B.O.T. of Italian group of investors

Construction costs: 10 Mil US$

Algeria

East-West Highway, Lots 1 and 2 – Committment Ing. Lars Poduie on behalf of SAUTI Srl

Date: 2008

Client: SAUTI Srl on behalf of Ministere des Routes (DZ)

Constructive design and technical assistance to companies for hydraulics works for the construction of the East-West Highway, Lots 1 and 2. 

Democratic Republic of Congo

Refurbishment of Tschikapa and Lubumbashi Airports

Date: 2005 – 2008

Client: R.V.A. (Regie des Voies aériennes) (RDC) – Private Consortium

Feasibility Study of the refurbishment of Tschikapa and Lubumbashi airports for a B.O.T. concession with European and Middle East’s Enterprises.

Hungary

Conversion of Kaposvar Airport

Date: 2006

Client: Hungarian Ministry of Transports

Market Research Study for the conversion of the Military Air Base of Kaposvar to Civil Aviation Airport; new links to Far East Countries and development of the Intercontinental Cargo Sector.

Sri Lanka

Enlargment of national roads in Sri Lanka – Committment Ing. Lars Poduie on behalf of Renardet S.A.

Date: 2006

Client: Renardet S.A. on behalf of Ministry of Transports (CL)

Executive Design of the enlargment of national roads in Sri Lanka: Hydrological studies and design of hydraulic works.

Italy

Comiso – Vittoria Highway – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date:  2006

Client: Bonifica SpA on behalf of Ragusa Municipality

Final Design of the Hydraulic and drainage works and hydrological studies of the new road link Comiso-Vittoria.

Italy

Underpass of Piazza della Repubblica (PR) – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date: 2005

Client: Bonifica SpA on behalf of Parma Municipality

Hydrological studies and preliminary, final and executive design of the Hydraulic and drainage works of the underpass of Piazza della Repubblica and connections between the streets Mantova and Toscana in Parma.

Italy

Enlargment to the third lane of the A1 Milano-Napoli Highway – Section Fiano Romano Station – G.R.A. of Rome – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date: 2004

Client: Bonifica SpA on behalf of ANAS SpA

Hydrological studies and Final Design of the Hydraulic and Drainage works.

Italy

Road Pedemontana Marche (Fabriano-Muccia) – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date:  2004

Client: Bonifica SpA on behalf of Regione Marche

Hydrological studies and Final Design of the Hydraulic and Drainage Works.

Italy

Variant E78 Grosseto-Fano from the locality Le Ville di Monterchito the locality Parnacciano – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date: 2004

Client: Bonifica SpA on behalf of ANAS SpA

Hydrological studies and Preliminary Design of the Hydraulic and Drainage Works.

Italy

Itinerary North-South Lot C2 – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date: 2004

Client: Bonifica SpA on behalf of ANAS SpA

Hydrological studies and Final Design of the Hydraulic and drainage works of the itinerary North-South  Lot C2 – from the S.S. n°121 “Catanese” to the A/19 Palermo-Catania junction of Mulinello escluso – DG 30/97.

Italy

Variant to the S.S. 1 Aurelia to  La Spezia Municipality Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date: 2004

Client: Bonifica SpA on behalf of La Spezia Municipality

Hydrological studies and Final Design of the Hydraulic and Drainage Works. 

Italy

S.S. 445 “GARFAGNANA” – Committment Ing. Lars Poduie on behalf of Bonifica SpA

Date: 2003

Client: Bonifica SpA on behalf of Lucca Municipality

Hydrological studies and Final Design of the Hydraulic and drainage works of the S.S. 445 “GARFAGNANA” near Castelnuovo Garfagnana.

Poland

Market research in Poland

Date: 2003 – 2006

Client: PZL – NIELEC (PL)

Market Research for a new executive jet plane in cooperation with Piaggio Aero Industries S.p.A.

Italy

Veneto Region Aeronautical Transports Master Plan

Date: 2002 – 2003

Client: Regione Veneto (IT)

Flight traffic analysis, minor airports and airfields assessment in Veneto Region in accordance with the Regional Transport Plan and National Investment Program for the airports

Italy

Rehabilitation and upgrading of Urbe Airport

Date: 2002 – 2005

Client: Private Consortium (IT)

Preliminary Design for the rehabilitation and upgrading of Urbe Airport in Rome on a B.O.T. scheme. Technical evaluations for runway and terminal.

Construction costs: Euro 30 Mil

Italy

Master Plan for amphibian pax flight service

Date: 2002

Client: ITALIA NAVIGANDO S.p.A. (IT)

Master Plan and Feasibility Study for an amphibian pax service connecting islands Lipari – Tremiti – Vulcano – Ponza.

Italy

Connection Fontana Rossa Airport – Catania City Town

Date: 2001

Client: GESAC (IT) / NS Dutch Railways (NL)

Feasibility Study for a B.O.T. rail connection airport – city town, including new terminal station in Catania Airport.

Construction costs: Euro 22 Mil

Italy

Basilicata Regional Airport

Date: 2001

Client: Ministry of Transports (IT)

Master Plan for the new regional airport (feasibility study on sites of Grumento – Val d’Agri, Pisticci, Potenza).

Libya

Refurbishment works at Tripoli Airport

Date: 2005

Client: Ministry of Defence and General Aviation (LAR)

Detailed Design and Tender documents for the refurbishment works of helicopter hangar.

Construction works: Euro 14 Mil

San Salvador

Upgrading of San Salvador Airport

Date: 2001

Client: SEA (IT) – NACO (NL)

Feasibility Study for the upgrading of the airport of San Salvador, in connection with the major cargo traffics of Central America.

Nicaragua

Market Research for a new airline operating USA and Central America

Date: 2000

Client: Ministry of Transports of Nicaragua (fund. IBRD)

Feasibility study for the establishment and management of a new airline operating between the Countries of Central America and U.S.A.

Italy

Refurbishment of Aviano Hangar N.2

Date: 1999 – 2002

Client: Department of Air Force – United States Air Force in Europe (US)

Detailed Design of Aviano NATO Base Hangar n. 1,2 and 3.

Construction costs: 20 Mil US$

Italy

New commercial harbour of Otranto

Date: 1997-1999

Client: Municipality of Otranto (IT)

Technical-economic analysis for the new commercial harbour within the Interreg Development Plan Italy-Albania.

Italia-Trasporti-02

Turkey

Technical Proposal for B.O.T. airports project

Date: 1997 – 2001

Client: JV ELETTROBETON (IT) – ITIN – SAVE (IT)

Technical Proposal for the concession in B.O.T. of the following airports: Bodrum, Dalaman, Izmirn, Antalyia and Istanbul.

Poland

Airport of Biela Podlaska

Date: 1999

Client: Private Handling Company

Feasibility Plan and Study for reconversion of the former military airport of Biela Podlaska (intermodal system of the Amsterdam-Berlin-Warsaw-Brest-Moscow axis) into a commercial hub for daily trading of fresh flowers from Holland into Russia, Moldova and Ukraine.

Slovakia

Development of Kosice airport

Date: 1998 – 1999

Client: CEE – PHARE (in JV with KAMPSAX)

Feasibility study for the inclusion of the airport in the intermodal system of the axis Trieste-Budapest-Kiev in the framework of the European Bank for Reconstruction and Development’ plan of conversion of border military airports from Eastern Europe into commercial airport.

Grenadine

Canouan Airport

Date: 1997 – 1999

Client: Ministry of Transports (fund. IBRD)

Preliminary Design, Detailed Design and works supervision of airport runway, terminal and tower installation of Vasis, APAPI. Upgrading to International Airport.

Construction costs: 25 Mil US$

Russia

Upgrading of Kaliningrad airport

Date: 1997 – 1999

Client: CEE – PHARE (in JV with KAMPSAX)

Feasibility Study for the PHARE finacing for the construction of new runway and pax-terminal.

Albania

Fushe Kruje – Mamurras road

Date: 1998 – 1999

Client: MAK (AL)

Final and Detailed Design of highway (12 Km), including interchange Fushe Kruje, hydraulics and protection works, 2 viaducts.

Construction costs: 3 Mil US$

Albania

Lezha-Shkoder road

Date: 1998

Client: Ministry of Public Works (AL) (fund. World Bank)

Environmental Impact Assessment and Detailed Design Review of Lezha-Shkoder road (33 km).

Construction costs: 16 Mil US$

Albania

Highway Vlore Durres

Date: 1997 – 1998

Client: Ministry of Transports and Public Works (AL) (Phare National Transport Programme)

Detailed Design, EIA and Tender Documents of the highway Vlore Durres (Class III CNR, Italian Roads Stds).

Construction costs: 36 Mil US$

Albania

Roads master plan for Bathore and Lapraka areas

Date: 1997 – 1998

Client: Ministry of Construction (AL) (fund. World Bank)

Final and Detailed Design, EIA and Tender Documents.

Albania

Master Plan for the refurbishment of Pish Poro and Saranda Airports

Date: 1996 – 1997

Client: EBRD / Golden Tulip (NL)

Feasibility Study for the revaluation of the Albanian coast for tourism activities with the restructuring of the Airports of Pish Poro and Saranda in the south of the country.

Construction costs: 25 Mil US$

Poland

Connection to Industrial Park of Malasowice

Date: 1997

Client: Private investors Italian / Dutch Group

Feasibility Study of the intermodal road-rail-cargo connection with Bielapodlanska Airport.

Construction costs: 25 Mil US$

Turkey

Technical Proposal for B.O.T. project for Istanbul Airport

Date: 1996

Client: SAVE (IT) – CGEI – ELETTROBETON (IT) / Ministry of Transports (TR)

Technical Proposal for B.O.T.; Design Review of the terminal (design by OVE-ARUP).

Korea

Drainage network of Seoul Airport

Date: 1996 – 1997

Client: HYUNDAI Construction (ROK)

Detailed Design of the drainage network of Inchon Airport (Seoul), approx. 120 km conduits.

Construction costs: 120 Mil di US$

Bulgaria

Cargo Terminal of Burgas Airport

Date: 1996

Client: CEE – PHARE / NETHCONSULT (NL)

Preliminary Design of the cargo-terminal and Feasibility Study for the implementation of cargo transport in the area.

Construction costs: 12 Mil US$

Albania

Qaf Kasha-Rinas road

Date: 1996 – 1998

Client: Ministry of Public Works (AL)

Preliminary Design and Detailed Design of the connection Qaf Kasha-Rinas-Tirana Airport (13 km).

Construction costs: 48 Mil US$

Albania

Koman – Fierza road

Date: 1995

Client: Ministry of Public Works – General Roads Directorate

Preliminary Design of 62 km mountain road as alternative direct connection from Shkoder to Kossovo along the Drin Valley.

Construction costs: 36 Mil US$

Albania-Trasporti-06

Albania

Tirana-Durazzo 4 lanes highway

Date: 1993 – 1996

Client: Ministry of Public Works (AL)

Feasibility Study and Detailed Design of the highway (32 km), sections Tirana – Vore and Vore – Durazzo (class III CNR Italian Roads Stds).

Albania

Elbasan – Qaf Thane road

Date: 1993 – 1996

Client: Ministry of Public Works (AL)

Feasibility Study and Detailed Design for the reconstruction and upgrading to Category IV CNR (Italian Roads Standards) of Lots 2, including Librashd town bypass Lot 1, Elbasan‐Qukes, and Cat. V of Lot 3, Qukes – Qaf Thane, major works design (viaducts and tunnel), drainage network, ESIA, resettlement and relocation plans.

Construction costs: 35 Mil US$

Albania

Tapize-Fushe Kruje road

Date: 1993 – 1996

Client: Ministry of Public Works (AL)

Detailed Design, EIA, Tender Documents of the refurbishment works for Tapize-Fushe Kruje road (IV CNR) 7,2 km in plain area on the axis Tirana – Scutari.

Construction costs: 8 Mil US$

Albania

Tirana Ring Road

Date: 1994 – 1995

Client: Ministry of Public Works (AL)

Feasibility Study and Detailed Design of Tiran ring road (8 lanes, 2 km).

Construction costs: 18 Mil US$

Albania

Koman – Fierze – B.Curri – Q.Morine road

Date: 1994

Client: Ministry of Public Works (AL)

Feasibility Study and Preliminary Design (65 Km).

Albania

Kapshtice – Podgradec road

Date: 1994

Client: Ministry of Public Works (AL)

Feasibility study (80 Km).

Albania

Kakavije – Tepelene – Vlore road

Date: 1994

Client: Ministry of Public Works (AL)

Final Design (150 Km).

Albania

Tepelene – Fier road

Date: 1994

Client: Ministry of Roads (AL)

Preliminary Design.

Albania

Fier – Rrogozhine road

Date: 1994

Client: Ministry of Roads (AL)

Preliminary Design.

Albania

Fier – Vlore road

Date: 1994

Client: Ministry of Roads (AL)

Preliminary Design.

 

Albania

Librazhd – Qafe Thane road

Date: 1994

Client: Ministry of Public Works (AL)

Final Design of enlargement works (35 Km).

Albania

Orikum – Llogara road

Date: 1994

Client: Ministry of Public Works (AL)

Final Design.

Albania

Libofsh – Ndernenas road

Date: 1994

Client: Ministry of Public Works (AL)

Supervision of earth works, civil works, drainage network (10 Km).

Construction costs: 18 Mil US$

Albania

Ngracanit road

Date: 1994

Client: Ministry of Public Works (AL)

Supervision of earth works, civil works, drainage network (8 Km).

Construction costs: 14 Mil US$

Albania

Greshices road

Date: 1994

Client: Ministry of Public Works (AL) – General Roads Directorate

Supervision of earth works, civil works, drainage network (14 Km).

Construction costs: 10 Mil US$

Albania

Commercial Harbour of Valona

Date: 1993 -1994

Client: E.E.C. – Sparaco Spartaco S.p.A. (IT) on behalf of Albanian Ministry of Transports

Feasibility Study of the New Commercial harbour including traffic studies, urbanization and environmental assessment.

Construction costs: 110 Mil US$

Albania

Tirana Rinas Airport

Date: 1993 – 1994

Client: JV MALTAURO (IT) – CASTELLI (IT) – CER (IT) – ITIN (IT) (Project Financing)

Feasibility study for new airport of Tirana: runway upgrading and Terminal; study for the improvement of traffic to and from Tirana city.

Construction costs: 35 Mil US$

Albania

Highway Durres – Qafe Thane – Macedonian border

Date: 1993 – 1994

Client: Ministry of Public Works (AL) – General Roads Directorate

Feasibility Study and Final Design (approx. 200 Km).

Albania

Milot – Lezhe road

Date: 1993 – 1996

Client: Ministry of Public Works (AL)

Feasibility Study, Detailed Design, EIA of Milot-Lezhe road (Cat. IV CNR Italian Roads Stds) on Tirana-Scutari axe (13 km in plain area, viaducts on Mat and Drin rivers, total length 850 m).

Construction costs: 10 Mil US$

Albania

Durres – Rrogozhine road

Date: 1992 – 1993

Client: Ministry of Foreign Affairs (IT) – Development Cooperation (IT)

Feasibility Study (36 km).

Construction costs: 20 Mil US$

Albania

Elbasan – Gramsh road

Date: 1992 – 1993

Client: Ministry of Roads (AL)

Supervision of earth works, civil works, drainage network (42 Km).

Construction costs: 51 Mil US$

Albania

Tirana-Elbasan road

Date: 1992 – 1993

Client: Ministry of Transports (AL)

Feasibility Study of a montaneous road (44 Km).

Construction costs: 70 Mil US$

Italia

Drainage network “Marco Polo” Venice Airport

Date: 1994 – 1995

Client: Studio Architettura MAR (IT)

Drainage and  Sewage Treatment Plant of the first rainfalls (de-oiling) of the new aprons of the “Marco Polo” Venice Airport : Executive Design and thechnical specifications; Hydraulic control of the canal Pagliaghetta of the Consortium Dese Sile.

Italy

Ponte San Marco – Lonato – Desenzano – Sirmione connection

Date: 1992 -1994

Client: Ferrovial (E) – Elettrobeton (IT)

Detailed Design of the connection (ANAS 1st cat.) Ponte San Marco – Lonato – Desenzano – Sirmione.

Construction costs: 35 Mil US$

Germany

Dippoldiswalde – Altenberg road

Date: 1992

Client: Saxony Land / Municipality of Dippoldiswalde (D)

Feasibility Study for the rehabilitation of Dippoldiswalde – Altenberg road drainage system.

Construction costs: 12 Mil US$

Germany

Rehabilitation and Expansion of Dresden – Klotzsche Airport

Date: 1992

Client: Saxinvest – Dresden Airport (D) (Project Financing)

Feasibility study for the rehabilitation and expansion of Dresden – Klotzsche airport.

Construction costs: 75 Mil US$

Turkey

Fethiye fish harbour

Date: 1992-1993

Client: Municipality of Fethiye (TR) (fund. Italian Min. For. Aff.)

Technical-economic proposal for the fish-harbor, dredging works, beach feeding, wastewater undersea discharge system.

Czech Republic

Refurbishment works on Dresden-Prague road

Date: 1992

Client: Private Contractor Consortium (D)

Feasibility Study for the improvement of Dresden – Prague corridor on a B.O.T. proposal for a possible tunnel.

 

Italy

Salerno-Reggio Calabria Highway

Date: 1991 – 1992

Client: ANAS (IT)

Preliminary and Final Design of the realignment of highway Salerno-Reggio Calabria, section km 316,800 – km 349,300.

Construction costs: 31 Mil US$

Malaysia

Doubling of K. Lampur – Karak Highway

Date: 1991

Client: Kerjan Biuaan Consortium (MAL)

Feasibility Study for the privatization of the toll highway and preliminary study of doubling the highway, section Gombac – Beniong (42 km) with 3 major viaducts, over 500 m long and 2 km of tunnels.

Construction costs: 180 Mil USD

Italy

Val di Susa Motorway

Date: 1990

Client: SACIS (IT)

Feasibility Study and Preliminary Design of a toll motorway – 2 carriageways with 2 lanes + shoulders in montaneous area (km 11.30).

Construction costs: 51 Mil US$

Ethiopia

Massawa Saline rail connection

Date: 1989 – 1990

Client: IDECO / BAD

Detailed Design and Tender Documents for the refurbishment works of rail connection.

Construction costs: 12 Mil US$

Etiopia

Massawa Saline

Date: 1989-1993

Client: IDECO

Final Design,  bathymetric and geological surveys, and Tender documents of the Massawa saline.

Somalia

Garoe Bosaso road

Date: 1989 -1993

Client: MAE (IT)

Final Design of carriageway including drainage works, viaducts and various hydraulic works.

Construction costs: Euro 60 Mil

Italy

Perdasdefogu-S.Lorenzo Cape road

Date: 1990

Client: Ministry of Defence (IT)

Preliminary Design of a military road crossing a flood area 12 Km wide – 2 lanes + shoulders.

Construction costs: 17.5 Mil US$

Saudi Arabia

Jeddah Touristic City Project

Date: 1989

Client: Saudi Company for Recreation Center (KSA)

Master plan of the road network serving a turistic area approx. 280 ha (21 Km main road).

Construction costs: 75 Mil US$

Arabia Saudita

Jabal Al Tawilah Urban Development Project

Date: 1989

Client: Fast Contracting Co. (KSA)

Preliminary Design of the urban road network: 4.2 Km expressway 5 lanes, 5.2 Km highway 4 lanes, 38.5 Km motorway 4 lanes.

Construction costs: 100 Mil US$

Capo Verde

Quay on Maio’s harbour

Date: 1988-1990

Client: IDECO (IT) – Private Consortium

Detailed design of wood quay serving Maio saline, supporting water intake conduit, belt conveyer, and allowing mooring of small vessels; including maritime analysis, structure design, technical specifications and B.o.Q.

Italy

Realignment of Val Basento road

Date: 1988

Client: SACIS (IT)

Final Design of realignment and slope protection works for the 4 lanes highway crossing Basento Valley.

Construction costs: 11 Mil US$

Italy

Drainage networks of A1 and A2 highways

Date: 1987 – 1988

Client: AUTOSTRADE S.p.A. (IT)

Final Design of the drainage networks and slope protection works relevant to the enlargements to 3 lanes of A2 highway, section GRA Roma – S. Cesareo (12 km) and A1 highway, section GRA Roma – Fiano Romano (19 km).

Construction costs: 27 Mil US$

Italy

Upgrading of Drainage Network of Fiumicino Airport

Date: 1986- 1989

Client: ALITALIA (IT)

Supervision of Works of the drainage network of Fiumicino Airport in Rome.

Construction costs: 4 Mil US$

Italia-Trasporti-01

Camerun

Grande Voirie de Yaoundé

Date: 1987

Client: Ministère de l’Urbanisme et de l’Habitat (CAM)

Preliminary and Final Design of the urban 6 lanes motorway.

Construction costs: 47 Mil US$

Libya

Mizda-Nisma road

Date: 1985

Client: Ministry of Roads (LAR)

Detailed Design and Tender Documents of the Mizda – Nisma road km 34.750, including major and minor works.

Construction costs: 125 Mil US$

Libya

Orban-El Gamata road (II Phase)

Date: 1985

Client: Ministry of Roads (LAR)

Detailed Design and Tender Documents of the Orban – El Gamata road (II Phase), 70 km.

Construction costs: 160 Mil US$

Libya

Kiklah-Zarat road

Date: 1985

Client: Ministry of Roads (LAR)

Detailed Design and Tender Documents (6.8 Km).

Construction costs: 47 Mil US$

Libya

Orban-El Gamata road (I Phase)

Date: 1984

Client: Ministry of Roads (LAR)

Detailed Design and Tender Documents (32.5 Km).

Construction costs: 53 Mil US$

Libya

Shakika-Wans road

Date: 1983

Client: Ministry of Roads (LAR)

Detailed Design and Tender Documents (32 Km).

Construction costs: 55 Mil US$