JORDAN

hydraulics

Sector: HYDRAULICS – WATER SUPPLY

Date: 1999

Client: Ministry of Water Resources – Private Consortium

Description: Feasibility Study for B.O.T. project of the water supply network from Aqaba to Amman along the railway track Aqaba-Amman including 5 pumping stations

Sector: HYDRAULICS – HYDRO POWER PLANTS

Date: 1997 – 2001

Client: ECIP ELETTROBETON BNL

Description: Feasibility Study and preliminary design for the HPP at King Talal Dam (peak plant, 200 MW)