Selection of a consultant for APS/ APD/ DAO studies and monitoring of construction work on hydraulic infrastructure for the Regional Support Project for Pastoralism in the Sahel (PRAPS 2-SN) in the regions of Saint Louis, Matam and Louga
Date: 2023 – en cours
Client: Ministry of Livestock and Animal Production
The aim is to update the detailed pre-project studies for the infrastructure, study the new sites planned as part of the project, draw up the tender documents and supervise and monitor the works. Studies have already been carried out during the first phase of the project, so all the studies carried out in these areas will be updated and any corrections made. As a result, 02 new sites (the old ones are covered by another project) will be the subject of a full study. The studies will focus on pastoral hydraulic infrastructures, including : Ten (10) new boreholes equipped with all ancillary works (water towers, standpipes, drinking troughs, gallows, drinking water supply network, chlorination unit); all 10 boreholes will be equipped with generators and submersible electric pumps.
Sector : Agro-pastoral infrastructure
Rwanda
Feasibility Study for Rehabilitation of Nyabarongo I Hydropower Plant
Date: December 2022 – May 2023
Client: Energy Development Corporation Ltd (EDCL)
Rwanda Energy Group (REG) through Energy Development Corporation Limited (EDCL) in partnership with Rwanda Government, MINECOFIN provided resources to conduct design of repair works, supervision, and implementation of the project. Nyabarongo HPP Rehabilitation seeks to solve the issues caused by heavy rain.
Italy
Works to improve the efficiency of the sewerage and drainage system at the Fatebenefratelli Hospital, Tiber Island, Rome
Date: Aprile 2023 – ongoing
Client: Fatebenefratelli Hospedale, Tiber Island – Gemelli
Feasibility, final and executive design of maintenance and efficiency measures for the sewerage and drainage system of the hospital complex at the Tiber Island in Rome.
Sector :Sewage
Italy
Replacement of the central penstock at Lasa in the Vinschgau valley
Date: February 2022 – ongoing
Client: Alperia Innoveering Srl
Assistance with construction management for the replacement of the DN 1700-DN1450 pressure pipe at the Lasa hydroelectric power station (BZ).
Sector: Hydroelectric
Italy
Hydraulic regimentation works to protect the FS Bressanone-San Candido (BZ) line.
Date: 2022 – 2023
Client: Alpin Geologie on behalf of RFI Rete Ferroviaria Italiana S.p.a.
Detailed design of drainage and hydraulic regimentation works to protect the Bressanone-San Candido railway line at the municipality of Valdaora (BZ)
Sector : Hydraulics
Rwanda
Pre-feasibility and feasibility studies on 5000ha net command areas ineastern province of Rwanda on behalf of Kayonza Irrigation And Integrated Watershed Management Project (KIIWP)
Date: April 2022 – ongoing
Client: RAB (Rwanda Agriculture and Animal Ressources Development Board)
The objectives of the assignment are to: review the available documentation, including theexisting soil and topographic mapping, and carry out a rapid reconnaissance of the potential irrigation schemes in eastern province, to identify suitable sites, after discarding those deemed unsuitable/unviable, for subsequent prefeasibility studies; prepare prefeasibility studies on these selected schemes;select schemes to be considered by the prefeasibility studies to be worthy of feasibility studies, up to a total gross area of 8,000ha; carry out comprehensive feasibility studies on each of these shortlisted schemes, including socio-economic analyses, market and value chain assessments, topographic and soil mapping, preliminary engineering designs for the required infrastructure, the design of land husbandry measures in the hydrological catchment and irrigation command areas, estimates of capital and operation and maintenance costs as well as financial and economic analyses; recommend which of the shortlisted schemes should pass to the next stage of detailed design and implementation under KIIWP 2.consider all possible options for this and recommend the most suitable arrangements for the operation, maintenance and management of these schemes, identify any need for institutional development (i.e. legal framework, organizations and capacity building) and propose a strategy for the Client to achieve this development prior to launching the detailed designs under KIIWP 2
Sector : Irrigation
Rwanda
Detailed Studies, Design and Supervision of Works for Rehabilitation and Upgrading of Semi-Centralized Sewerage Systems on Kigali Estates
Date: 2018 – on going
Client: WASAC Ltd (RWA) (funding AfDB)
Feasibility and detailed studies, Technical and Management framework, preparation of the tender document, Environmental and Social Impact Assessment ESIA report for rehabilitation and upgrading the public semi-centralized sewerage systems in Kigali with its Environmental Management Plan (EMP) with issuance of ESIA Certificate from Rwanda Development Board (RDB), supervision of works for rehabilitation and upgrading of semi centralized sewerage systems and WWTPs in 15 Kigali Estates.
Sector : WWTP
Rwanda
Supervision of rehabilitation works of Rurambi Dyke
Date: 2020 – on going
Client: RWANDA AGRICULTURE AND ANIMAL RESOURCES DEVELOPMENT BOARD
The objective of this project is to rehabilitate Rurambi dyke and related irrigation structures and access road to make the scheme of Rurambi more productive. Rurambi Dyke is 9.25 km long and 2.5 m height, located between Masaka Sector, Kicukiro District and Mwogo Sector, Bugesera District. It was constructed mainly to protect Rurambi wetland from being flooded by Akagera River in order to develop agriculture in the wetland.
The works envisaged include: raising of the dyke (earth embankment) 1.2 m height maximum and rehabilitate related irrigation structures (primary canal sections) and access road.
Sector : Irrigation / Water Supply
Senegal
Programme for the sustainable development of pastoral farms in the Sahel (PDEPS)
Date: 2021 – on going
Client:Ministère de lÉlevage et des Productions Animales (MEPA)
Fund: Islamic Development Bank – Lives and Livelihoods Fund
Detailed studies, preparation of DAO and monitoring of the PDEPS infrastructure works.
Egypt
Rehabilitation and improvement of irrigation infrastructures in Fayoum and Minya Governorates
Date: 2017 – on going
Client: Consorzio Leonardo (IT) on behalf of Italian Embassy (EU-JRDP programme)
Technical assistance in construction supervision of irrigation works (3000 Feddan in Bahr Biahmu, 5200 Feddan in Bahr Awlad Mohamed and 7900 Feddan in Hafez Al Sharkya).
Sector: Irrigation
Sudan
Technical feasibility study for 2 earthen dams in North Darfur
Date: 2020 – on going
Client: Welthungerhilfe e.V.
The project is funded by the German Foreign Ministry (BMZ) to rehabilitate two earthen dams in Al Kuma and El Fasher rural localities in North Darfur State in collaboration with the national organization IRDS, to Improved food and nutrition security and resilience for returnees, IDPs and host communities
The study has included site investigation, soil study, hydrological analysis, geotechnical design, hydraulic design, socio–economic analysis, environmental studies, bills of quantities & tender documents for the rehabilitation of Al Kuma Irrigation Scheme and Um Maraheek Water Supply Scheme in North Darfur.
Sudan
South Darfur Livelihood and Agricultural Infrastructure Project
Date: 2020 – on going
Client: World Vision Deutschland e.V.
Technical Assistance to the review of Pre-Feasibility Study, preparation of Tender Documents and Project implementation
South Sudan
Engineering Designs and Supervision of Construction Works for the Improvement of Existing Water Treatment Plant and Extension of Water Distribution Network in Juba Center
Date: 2018 – on going
Client: South Sudan Urban Water Corporation (SSD)
Feasibility Studies, Detailed Design, B.O.Q., Tender Documents and Supervision of Works of rehabilitation and improvement of 30 Km of Juba water supply.
Italy
Integrated hydroelectric project in the Tiber river
Date: 2018 – on going
Client: city of Rome
Concept, Feasibility study and preliminary design development for the proposal to the relevant Institutions for the development of an integrated hydroelectric project in the Tiber river basin in Rome. The proposal integrates a solution for the restoring of the mobility on the Tiber river.
Madagascar
Supervision of rehabilitation works of Irrigation Upper Scheme of Manombo Ranozaza, Municipality of Ankililoaka, Toliara II, South-West Region
Date : 2018
Client : Direction Régionale de l’Agriculture et de l’Elevage Atsimo Andrefana (funding AfDB)
Works Supervision and Contract Adminsitration of rehabilitation works including 4 irrigation channels (50 km) on a 5.190 Ha irrigated scheme
Sector: Irrigation
Sudan
Feasibility Study for Kerfu Dam
Date: 2018
Client: COOPI International Cooperation (IT)
Feasibility Study, Detailed Design, B.O.Q., Tender Documents of small earth dam in North Darfur.
Sudan
Feasibility Study for Meski Dam
Date: 2018
Client: COOPI International Cooperation (IT)
Feasibility Study, Detailed Design, B.O.Q., Tender Documents of small earth dam in North Darfur.
Sudan
Khartoum State Master Plan for the Sewerage Networks, Sewage Treatment Plants, Reuse & Disposal
Date: 2018
Client: JV Techniplan International Consulting (IT) – Bannaga Consulting (SUD) on behalf of the Ministry of Infrastructure and Transportation – Khartoum State Sanitary Corporation (SUD)
Review of the Baseline Surveys, review of the Wastewater Generation Analysis, review of the Analysis of current water consumption, review of the Assessment of Groundwater Pollution, diagnostic review of Stakeholder requirements, insight in Current and Future Demands, screening of options for optimal choice, implementation strategy, Feasibility Study and reports.
Sudan
Water Sector Reforms and Institutional Capacity Development Program – Review and Update of Rural Water and Sanitation Construction Standards
Date: 2017 – 2018
Client: JV Techniplan International Consulting (IT) – Bannaga Consulting (SUD) on behalf of the Ministry of Water Resources, Irrigation and Energy (SUD)
Review and Update of 14 Technical Guidelines and Workshops in the States.
Italy
Reservoir Saslong
Date: 2017
Client: Patscheider & Partner Engineers (IT) on behalf of Funivie Saslong SpA (IT)
Detailed Design of the new reservoir for snowmaking system in Val Gardena (Bolzano Province), capacity 70.000 m3, earth dam height 10 m; Detailed Design, geotechnical design, B.O.Q., Tender Documents, Assistance in bid evaluation.
Italy
HPP Brunico
Date: 2016 – 2017
Client: Alperia Grennpower Srl (IT)
Hydraulic assessment and structural detailed design of the refurbishment works on the steel trough aqueduct over Rienza River of the penstock DN500 of the HPP Brunico.
Construction costs: 80.000 Euro
Italy
Verification of the performance of the hydroelectric plant Rabbies 4
Date : 2018
Client: Tschurchenthaler Turbinenbau Srl (IT)
Description: Technical testing of the 2 groups of turbine (400 kW each) of the new hydroelectric power plant Rabbies 4 in the municipality of Malè, Trento
Italy
HPP Brunico
Date: 2017
Client: Alperia Greenpower S.r.l. (IT)
Hydraulic Assessment of the steel trough aqueduct over Rienza river of the HPP Brunico. Hydraulic modelling of Rienza river.
Italy
HPP Villarfocchiardo (Turin) – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2016
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Green City Energy AG (D)
Due Diligence, Final Design and EIA of run-off river hydropower plant on Dora Riparia river in Villarfocchiardo (Turin Province), 1 Kaplan turbine 500 kW, max diverted flow 15 m3/s, gross head 3.4 m.
Construction works: 2.6 Mil Euro
Italy
Requalification of Vadena Municipality – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2016
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Vadena Municipality (IT)
Supervision of works on drainage and road works related to parking and urban area development project.
Construction costs: 1.1 Mil Euro
Italy
HPPs on river Sinigo (Bolzano) – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date : 2016
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of HYP Meran GmbH (IT)
Feasibility Study and Final Design of 2 run-off river hydropower plants on Sinigo river (Bolzano Province), 2 Pelton turbines (750 kW + 1.000 kW).
Italy
HPP Val d’Ortié (Belluno) – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2015-2016
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of EN&EN Srl (IT)
Final Design and EIA of run-off river hydropower plant in Val d’Ortiè, Dolomites area (Belluno Province), 1 Pelton turbine 500 kW.
France
HPP Loubejac
Date: 2016
Client: Patscheider & Partner Engineers (IT) on behalf of Green City Energy AG (D)
Due Diligence of run-of river HPP Loubejac on Aveyron river (L’Honor de Cos Province): 2 Francis turbines, 200 kW + 260 kW, max discharge 17 m3/s: hydrological study, refurbishment works design review, production estimate, B.o.Q. and cost estimate.
Italy
2 HPPs in Monguelfo (Bolzano) – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2014-2015
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of E-Werk Graf GmbH (IT)
Final Design of two run-off river hydropower plants on Rienza river (Monguelfo Municipality), 2 Francis turbines (2×550 KW) and 1 Kaplan S turbine (350 KW).
Italy
2 HPPs in Marlengo (Bolzano) – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2014-2015
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of municipalities of Marlengo and Aldino (IT)
Feasibility Study and Final Design of 2 run-off river hydropower plants on Adige river in Marlengo Municipality (Bolzano Province), 1 Kaplan turbine 850 kW (max diverted flow 26.5 m3/s, gross head 4.1 m) + 1 Kaplan turbine 150 kW (max diverted flow 6.5 m3/s, gross head 2.7 m).
Construction works: approx. 4.8 Mil Euro + 1.2 Mil Euro
Italy
HPP Schmelze – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2014
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of E-Werk Toblach GmbH (IT)
Final Design of refurbishment works of run-of river HPP “Schmelze” in Dobbiaco (Bolzano Province): renovation of water intake, sand trap, conduit, electromechanical equipment, 2 Francis turbines 600 kW + 630 kW.
Italy
PSHPP in Ruoti (Potenza) – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2012 – 2016
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Ruoti Sas (IT)
Feasibility, Final Design and preliminary EIA of pumping storage hydropower plant in South Italy (200 MW installed), between 2 reservoirs in Basilicata region; design of downstream reservoir,1 earth dam 30 m height, with impervious core, 1 Mil m3 capacity, on Fiumara di Ruoti river; upstream reservoir on existing lake upgraded, 1 Mil m3 capacity, sealing system with cladding package; including all hydraulic and civil works design (spillway, bottom outlets, intake, pressure conduit, cavern powerhouse.
Construction costs: 2 Mil Euro
Italy
Agricultural Farm Poggio delle Rose
Date: 2013 – 2014
Client: Poggio delle Rose srl (IT)
Feasibility Study, Detailed Design and Works supervision of irrigation and drainage networks of an agricultural farm in Vicenza municipality.
Italy
HPP Silvesterbach – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2011 – 2012
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of E-Werk Toblach GmbH (IT)
Final, Detailed Design and assistance to construction supervision of a run of river hydropower plant (1 Pelton turbine, 1 MW) in Dobbiaco (Bolzano, Italy).
Construction costs: 2 Mil Euro
Italy
2 HPPs on Saldur river – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2012
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Private Investors (IT)
Final Design of 2 cascade run of river hydropower plants in Mazia (Bolzano, Italy).
Italy
HPP Graf – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2011 – 2012
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of E-Werk Graf GmbH (IT)
Final, Detailed Design and assistance to construction supervision of a run of river hydropower plant (2xFrancis turbines, 1.8 MW) in Monguelfo (Bolzano, Italy).
Construction costs: 10 Mil Euro
Italy
HPP on Isarco river – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2011
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Private Investors (IT)
Final Design of the run-of river hydropower plant on Isarco river at Fortezza (Bolzano Province), 1 Kaplan turbine 4.3 MW, max discharge 30.5 m3/s, head 20 m.
Construction costs: 19 Mil Euro
Russia
Reservoirs in Sochi – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2011
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of VITA Srl (IT)
Detailed Design of 2 snow-making reservoirs in Sochi for the 2014 Winter Olympic Games, including sealing system and monitoring, water intake, spillways.
Romania
Reservoir Arieseni – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2011
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Private Consortium (RO)
Feasibility Study and Final Design of the reservoir for snow-making system in Arieseni (capacity 50.000 m3, earth dam 10 m height), including all hydraulic structures, pumping station, water intake and ancillary works.
Romania
Reservoir in Predeal – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2011
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Private Consortium (RO)
Feasibility Study for a reservoir in Predeal for snow making system.
Italy
2 Flow measuring stations – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2011
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Province of Bolzano (IT)
Feasibility study for 2 river flow metering in South Tyrol, on Ram and Braies rivers.
Italy and France
Several Due Diligences of HPPs – committment Eng. Lars Poduie on behalf of Ingegneri Patscheider & Partner Srl (IT)
Date: 2010 – 2017
Client: Ingegneri Patscheider & Partner Srl (IT) on behalf of Different Investors
Due Diligences of several run-of river hydropower plants, including hydrological studies, civil, hydraulic and electromechanical equipment review, productions estimates, B.o.Qs. and cost estimates evaluations.
Among others:
HPP Calvisano II on Chiese River (Brescia Province, Italy), HPP Moulin Les Bordes (Bruniquel Province, France), HPP Saint Antoignè (Sainte Jamme sur Sarthe Municipality, France), HPPs on Caluso Channel (Turin Province, Italy), HPP Codalonga (Belluno Province, Italy), HPPs on Brembo river at Ponte San Pietro and Treviolo (Bergamo Province, Italy), HPP Pollux on river Fibbio at Montorio (Verona Province, Italy), HPP Borgo alla Sega (Treviso Province, Italy), HPP Ronchetta on river Elvo at Muzzano (Biella Province, Italy), HPPs on Arno river at Subbiano and Ponte Caliano (Arezzo Province, Italy), HPP on river Vercio at Quarna Sopra (Verbania Province, Italy)
Italy
Crossing of the aqueduct of Naples of the high speed railway line Rome-Naples – committment Ing. Lars Poduie on behalf of Bonifica SpA (IT)
Date: 2004
Client: Bonifica SpA (IT) on behalf of TAV SpA (IT)
Constructive project of the aqueduct of Naples of the high speed railway line Rome-Naples.
Italy
Aqueduct of Locone – committment Ing. Lars Poduie on behalf of Bonifica SpA (IT)
Date: 2004
Client: Bonifica SpA (IT) per conto di Acquedotto Pugliese (IT)
Final Design of the hydraulics works.
Serbia
Refurbishment of water supply and sewage networks of the Municipality of Obrenovac
Date: 2003 – 2005
Client: Municipality of Obrenovac (SRB)
Feasibility Study for the rehabilitation of existing water supply network (850 km), intake from Sava River and existing wastewater network (150 km), covering an area of over 40.000 ha with 80.000 inhabitants. Proposal for Bank Financing.
Construction costs: 40 Mil US$
Bosnia Erzegovina
Integrated Project for the sustainable development of South Herzegovina
Date: 2002 – 2003
Client: Municipalities of Mostar and Stolac (BYH)
Feasibility Study for the construction of the water supply network serving the rural districts of Mostar and Stolac (45 km of PEHD pipes various diameters), intake and pumping stations from Neretva River. Proposal for Bank Financing.
Construction costs: 15 Mil US$
Ethiopia
Upgrading of Addis Abeba water supply network
Date: 2001 – 2002
Client: Ministry of Water Resources (ETH) – Euroestudios S.A. (E)
Feasibility Study for the rehabilitation and implementation of existing Addis Ababa water supply network. Tender Docs and Technical Specifications for the new alignment from the existing pumping station.
Construction costs: 10 Mil US$
El Salvador
HPP El Cimarron
Date: 2000
Client: Ministry of Natural Resources (ES) (fund. IBRD)
Appraisal and Feasibility study for the HPP El Cimarron – development of Rio Lempa Energy and Irrigation System (150 MW).
Ecuador
HPP Sucumbio
Date: 1999
Client: Ministry of Energy (EC) (fund. IBRD – E.E.S.)
Feasibility Study for Rio Due, Sucumbios (2 Power Stations x 40 MW/each) + 1 earth dam.
Construction costs: 80 Mil US$
Ecuador
LPG Plant in Galapagos
Date: 1999
Client: Galapagos Energy Company (EC)
Preliminary Design and Appraisal for five LPG Power Plants (7 MW) to be installed on 5 islands of Galapagos.
Jordan
Water supply of Amman
Date: 1999
Client: Ministry of Water Resources (HKJ) – BOT Consortium
Technical financial analysis for BOT project for the water supply network from Aqaba to Amman along the railroad (5 pumping stations included).
Construction costs: 100 Mil US$
Jordan
King Talal Peak HPP
Date: 1997 – 2000
Client: ECIP (EU) – ELETTROBETON (IT)
Feasibility Study for King Talal Pumping Storage HPP (200 MW) interconnected with neighbouring countries networks.
Construction costs: 150 Mil US$
Nicaragua
Copelar Dam
Date: 1997 – 1998
Client: Private Consortium – Enel (Empresa Nicaraguense de Electricidad) (NIC)
Feasibility Study for B.O.T. project (fund. IFC) for dam and HPP (400 MW).
Construction costs: 150 Mil US$ (Phase 1)
Guatemala
HPPs Totoncapan and Soloma
Date: 1995
Client: Ministry of Energy (GCA) (fund. IBRD)
Feasibility Study for 3 HPPs in Totoncapan and Soloma areas (approx. 40 MW)
Construction costs: 40 Mil US$
Albania
Rehabilitation of irrigation and drainage schemes for over 100.000 ha
Date: 1992 – 1997
Client: Ministry of Agriculture (AL) (fund. World Bank)
Work Supervision for rehabilitation of irrigation and drainage schemes covering an area of over 100.000 ha in 10 districts with over 50 contractors.
Construction costs: 44 Mil US$
Argentina
Cascade HPPs system in Mendoza province
Date: 1992 – 1994
Client: Land System SpA (IT) on behalf of EMSE (AR)
Feasibility Study for HPPs (40 MW).
Construction costs: 120 Mil US$
Albania
Aqueduct of Tirana and potabilisation plant
Date: 1992 – 1993
Client: Sigla (IT) – Conscoop (IT) on behalf of Albanian Ministry of Constructions
Feasibility Study of the aqueduct of Tirana (1st and 2nd Phase) from Bovilla Reservoir (Tirana). Feeding line, potabilization plant, rehabilitation of distribution network.
Construction costs: 34 Mil US$
Germany
Sewage and treatment plant of Dippodiswalde
Date: 1992
Client: Municipality of Dippoldiswalde (D)
Feasibility study of the sewage network and wastewater treatment plant, including EIA.
Construction costs: 15 Mil US$
Italy
Upgrading and refurbishment of irrigation scheme of Foglia Basin
Italy, 1992
Client: Consorzio Irrigazione Foglia (IT)
Detailed Design of upgrading and refurbishment works.
Construction costs: 21 Mil US$
Germany
Sewage of Döbeln
Date: 1991 – 1992
Client: Municipality of Döbeln (D)
Preliminary design of the sewage systems for 14 municipalities, including two wastewater treatment plants and pumping stations.
Construction costs: 70 Mil Euro
Hungary
Sewage of Budakeszi
Date: 1991
Client: Municipality of Budakeszi (HR)
Feasibility study and Detailed Design of the wastewater treatment plnat and sewage networks of Budakeszi and town hospital, including EIA.
Construction costs: 7 Mil US$
Germany
Sewage of Altenberg
Date: 1991
Client: Municipality of Altenberg (D)
Feasibility Study and Detailed Design of the sewage of Altenberg, including wastewater treatment plant (25.000 inhab.).
Construction costs: 24 Mil Euro
Italy
Water supply and sewage of residential complex “Nomentana” (Rome)
Italy, 1991
Client: Private Group (IT)
Detailed Design and supervision of works of the primary infrastructures (25.000 m2, approx. 150.000 m3).
Construction costs: Euro 10 Mil
Nicaragua
HPP of Apoyo
Date: 1989 – 1991
Client: Land System SpA (IT) on behalf of Ministry of Energy (NIC)
Feasibility Study and Preliminary Design of HPP (150 MW) in Apoyo lagoon, Managua municipality.
Feasibility Study for HPPs on Vojsa and Drin rivers. Technical evaluations on 30 sites (approx. 4.000 MW).
Ethiopia
Doubling of the HPP on the Sor river
Date: 1991
Client: National Environment Protection Authority (N.E.P.A.) (ETH) / UNDP
Feasibility study of a dam on the Sor river: feasibility project and related geological investigation for the damming of a barrage in mud 50 m high on the Sor river for the doubling of the existing HPP and flood control.
Ethiopia
HPP Sor – 2nd Phase
Date: 1991-1992
Client: Ethiopian Electric Light and Power Authority (E.E.L.P.A.) (ETH) (fund. UNDP)
Feasibility study for the upgrading of the HPP: reservoir on Sor River (20 Mil m3), dam (height 50 m) and intake works, penstock, Implementation of the powerhouse, substation and auxiliary installations.
Construction costs: 40 Mil US$
Ethiopia
Sor River Hydroelectric Project
Date: 1990 – 1991
Client: Ethiopian Electric Light & Power Authority (E.E.L.P.A.) (ETH) (fund. UNDP / Italian Min. of For. Aff.)
Feasibility Study, Detailed Design and Supervision of Works of the HPP with intake structure on Sor River. Weir, tunnel (9 m3/s), piezometric well, penstock (5 m3/s), powerhouse (5 MW), substation, auxiliary installations.
Construction costs: Euro 23 Mil
Ethiopia
Nura Era Conversion and Development Project
Date: 1989 – 1991
Client: Horticultural Development Corporation
Feasibility and Final Design of Middle Awash irrigation area and rehabilitation of existing networks (30.000 ha of gravity and sprinkler irrigation).
Construction costs: Euro 140 Mil
Importo dei lavori: Euro 140 Mil
Italy
HPP Ponte Lucano
Date: 1990
Client: FLYGT S.p.A. (IT)
Preliminary and final design for Ponte Lucano HPP on the Aniene River.
Italy
Sewage conduit in Venice
Date: 1989
Client: SVIT S.p.A. (IT)
Detailed Design of the sewage conduit (6 km), sea outlet and ancillary works.
Italy
Water supply of Mentana (Rome)
Date: 1989
Client: Municipality of Mentana (IT)
Detailed Design of the water supply serving the new residential area, and refurbishment of the existing structures.
Construction costs: 7 Mil US$
Rwanda
Survey and inspection on electro-mechanical equipments of Bugesera acqueduct
Date: 1989
Client: Electrogaz (RWA) (fund. African Development Bank)
Survey and inspection of HV line Musha-Cimbazy (25 Km) and electro-mechanical equipments of Bugesera-Kigali acqueduct.
Construction costs: 300.000 US$
Kenya
Diversion weir on Kerio River
Date: 1987 – 1989
Client: Ministry of Agriculture (EAK)
Detailed Design of the diversion weir on Kerio River for the irrigation scheme (3.000 ha).
Survey and inspection of the drainage network (28.000 ha).
Construction costs: 2 Mil US$
Ethiopia
Basic Seed Farm Project
Date: 1988 – 1989
Client: Seed Corporation (ETH)
Awasa – Shallo Unit (700 ha of Center Pivot sprinkler irrigation): Final design of pumping station from Awasa Lake, irrigation network (24 Center Pivots).
Construction costs: 12 Mil US$
Egypt
Tina Plain Development Project
Date: 1988 – 1988
Client: Ministry of Development – General Authority for Rehabilitation Projects and Agricultural Development (GARPAD)
Design Review on behalf of the World Bank of the irrigation projects for the agricultural development of North Sinai area, named Tina, Bardawil and El Arish (total 250.000 Feddan).
Turkey
Hydrogeological and Sanitary Refurbishment of Cankiri Municipality
Date: 1987 – 1990
Client: Municipality of Cankiri (TR)
Hydro geological rehabilitation works, sewer system and construction of wastewater treatment plant: Detailed Design and Supervision of Works relevant to: storm drainage network, wastewater sewage and treatment plant, mountain slopes defence works.
Construction costs: 60 Mil USD
Niger
Chya Hydro-Agricultural Development Project
Date: 1987-1988
Client : Ministère du Plan – Ministère de l’Agriculture (RN)
Feasibility Study for the irrigation development of 10.000 Ha of share of Niger river.
Construction costs: 37 Mil US$
Egypt
Sewage of Monufeia
Date: 1987
Client: Monufeia Governorate (ET)
Preliminary and Detailed Design of the sewage network serving the industrial area.
Construction costs: 3 Mil US$
Italy
Consorzio per la Bonifica della Stornara e Tara: Irrigation scheme of Conca Taranto
Date: 1987
Client: S.I.P.A.T. Studio d’Ingegneria Progettazione Acque Territorio (IT)
Detailed Design (II lot). Upgrading of the “Distretto T” in compliance to the management plan I.S.M.
Italy
HPP Ponte Ravedis
Date: 1987
Client: Opere Idriche S.p.A. (IT)
Hydropower potential exploitation of Cellina River downstream of Ponte Ravedis. Preliminary Design of in line structures, uphill pipelines, ballast, pensile crossings, anchorage blocks, etc.
Construction costs: 12 Mil US$
Italy
Refurbishment works on reservoirs
Date: 1987
Client: ENEL (IT) – ISMES (IT)
Detailed Design of refurbishment works on the following reservoirs: Rezzalasco, Zebru, Sacco, Zita, Cancano and S.Giacomo di Praele.
Senegal
Hydro-agricutural development of Collengal du Bakel
Date: 1985-1988
Client : O.M.V.S. (Organisation pour la Mise en Valeur du fleuve Sénégal) (SN)
Feasibility Study for the hydraulic works of Collengal Basin in Bakel Development Plan (35.000 ha). Detailed Design for a pilot irrigation scheme 200 ha.
Construction costs: 27 Mil US$
Senegal
Integrated Rural Development Plan of Sedhiou
Date: 1985-1988
Client : Ministère du Développement Rural (SN)
Detailed Design of civil infrastructures and other interventions in Casamanche area.
Construction costs: 93 Mil US$
Nigeria
Mambilla Plateau – Tea Estate Irrigation Project
Date: 1986 – 1987
Client: Yola Tea – Borno State
Final Design and Works Supervision for irrigation of 1.200 ha serving the Mambilla tea plantation.
Construction costs: 12 Mil US$
Nigeria
Baga & Kirenowa Polder Power Plants
Date: 1985-1987
Client: ALTS (WAN) – Ministry of Natural Resources (WAN)
Detailed Design of the power plants serving Kirenowa and Baga (2 x 70 MW each) on Lake Chad.
Construction costs: 120 Mil US$
Nigeria
Alau Dam
Date: 1985-86
Client: Ministry of Natural Resources (WAN)
Feasibility Study and Final Design of the dam on Lake Alo, Maiduguri – Borno State.
Italy
Consorzio di Bonifica della Capitanata: Reservoir Marana Cerasa
Date: 1986
Client: S.I.P.A.T. Studio d’Ingegneria Progettazione Acque Territorio (IT)
Intake on Rio Salso and ancillary works for connection to main adduction Ofanto-Marana Capacciotti. Preliminary Design: hydrology study, hydraulics computation and geotechnical analysis.
Mali
Rehabilitation of Bamako-Baguineda Irrigation Scheme
Date: 1986 – 1986
Client: Ministry of Agriculture (RMM)
Detailed Design for the rehabilitation of 213 Ha irrigation scheme; refurbishment of 4.500 Ha drainage network.
Construction costs: 18 Mil US$
Nigeria
Gashua Irrigation System Scheme
Date: 1985 – 1987
Client: C.B.D.A. (Chad Basin Development Authority) (WAN)
Feasibility Study and Detailed Design of irrigation scheme (1.000 ha) rice fields in Gashua area on the Yobe River. Feasibility Study for additional 6.000 ha rice area.
Construction costs: 17 Mil US$
Madagascar
Morondawa irrigation scheme
Date: 1985
Client: African Development Bank
Tender for Sprinkler and Center Pivots for Morondawa irrigation scheme (2.000 ha).
Construction costs: 14 Mil US$
Italy
Consorzio di Bonifica Apulo Lucano
Date: 1985
Client: S.I.P.A.T. Studio d’Ingegneria Progettazione Acque Territorio (IT)
Hydrological studies of the Tittadegna River Basin.
Italy
Refurbishment works of water supply networks of Puglia, Molise and Abbruzzo Regions
Date: 1985
Client: S.I.P.A.T. Studio d’Ingegneria Progettazione Acque Territorio (IT)
Preliminary Design of the interventions on the water supply network of Puglia Region with feeding from external areas: new pumping stations, Chieuti reservoir (earth dam, volume 100 Mil m3); hydrological studies, hydraulic computations, geotechnical analysis.
Italy
Carapellotto reservoir
Date: 1985
Client: S.I.P.A.T. Studio d’Ingegneria Progettazione Acque Territorio (IT)
Detailed Design of the earth dam on Carapellotto River (Municipality of Palazzo d’Ascoli), including weirs and diversion works on river Cervaro and Carapelle. Reservoir volume 80 Mil m3; hydrological studies, hydraulic computations.
Saudi Arabia
Irrigation Schemes of Wadi Dawasir, Hail and Harad
Date: 1984 – 1985
Client: Private Arab Investors
Preliminary and Detailed Design for drip irrigation schemes (pivot and rotating spray line).
Saudi Arabia
Rehabilitation of Riyadh sewage
Date: 1984
Client: TPL / Riyadh Municipality (KSA)
Detailed Design for the rehabilitation of part of the sewer network and related fertirrigation systems for Riyadh city. Preliminary and Detailed Design for sprinkler irrigation by pivot and flying lines systems in Hail, Bureidah and Hufuf areas for about 12.000 ha.
Construction costs: 20 Mil US$
Nigeria
Jere Bowl Rice Scheme
Date: 1982-1984
Client: Chad Basin Development Authority (WAN)
Feasibility Study of rice scheme (10.000 ha) close to Maidouguri. Detailed Design and works supervision for 1st lot (6.000 Ha).
Construction costs: 40 Mil US$
Nigeria
Kirenowa Polder Project
Date: 1982-1985
Client: CBDA (WAN)
Detailed Design of Irrigation Scheme, Polder roads (over 300 km of rural and medial communication roads), sprinkler irrigation networks and 20.000 ha irrigated by gravity.
Construction costs: 500 Mil US$
Syria
Al Rashed – Goedeb Raqqa Rice Scheme
Date: 1984 – 1985
Client: General Organization for the Exploitation and Development of the Euphrates Basin (GOEDEB) (SYR)
Feasibility Study for Al Rashed – Goedeb Raqqa irrigation scheme (6.000 ha of sprinkler irrigation); Detailed Design of Acsad Salamiya (1.300 ha of gravity irrigation); Detailed Design of Maskanek Farm irrigation scheme (3.500 ha of irrigation conversion gravity to sprinkler).
Construction costs: 4,3 Mil US$
Somalia
Afgoi & Merca Irrigation Schemes
Date: 1984 – 1985
Client: Ministry of Agriculture (SO)
Preliminary design for the irrigation development of Afgoi banana production farm (1.500 ha); irrigation scheme for a banana plantation in Merca area (2.000 ha).
Construction costs: 14 Mil US$
Bahrain
Manama & Hamala Irrigation Schemes
Date: 1984
Client: Ministry of Natural Resources (BRN)
Detailed Design of a sprinkler irrigation scheme close to Manama (600 ha); supervision of works of the supply sprinkler system for fodder in Hamala (350 ha).
Construction costs: 2 Mil US$
Algeria
El Cheliff Irrigation Project
Date: 1984 – 1987
Client: Ministère de l’Hydraulique (DZ)
Detailed Design and Works Supervision of the irrigation development of part of El Cheliff complex (1.200 ha of gravity irrigation).
Construction costs: 18 Mil US$
Nigeria
Baga Polder Project
Date: 1983 – 1989
Client: Chad Basin Development Authority (WAN)
Detailed Design of irrigation scheme 20.000 ha in shore of Chad Lake. Gravity and sprinkler irrigation.
Project Development Farm (BP/BDF-I): 500 ha Pilot Farm.
Power Distribution and Monitoring System (BP/2-D): Detailed Design of electrical supply network and SCADA systems (5.000 ha sprinkler irrigation)
Construction costs: 260 Mil USD
Nigeria
Baga Polder Chad Dike
Date: 1980 – 1984
Client: Chad Basin Development Authority (WAN)
Detailed Design and Supervision of Works of sheet piling dam on shoreline of Lake Chad (43 km length).
Construction costs: Euro 5 Mil
Syria
Rehabilitation of Maskanek Farm
Date: 1983
Client: General Organization of the Exploitation & Development for the Euphrates Basin (GOEDEB) (SYR)
Feasibility Study for the rehabilitation and conversion to drip irrigation of 3.500 Ha gravity irrigation scheme.
Egypt
Sohag & Fayoum Irrigation Schemes
Date: 1982 – 1983
Client: Ministry of Agriculture (ET)
Detailed Design for 10.000 Feddan sprinkler irrigation, including pumping stations and drainage networks.
Construction costs: 20 Mil US$
Nigeria
Agritech Pilot Farm Project
Date: 1983
Client: Agritech S.p.A. (IT)
Detailed Design of the irrigation plant (600 ha).
Construction costs: 11 Mil US$
Lebanon
Acqueduct of Beiruth
Date: 1982
Client: Ministere des Resources Hidrauliques et Electriques (RL)
Master Plan of upgrading works of Beiruth water supply.
Italy
Refurbishment works on potabilization and irrigation plants of Consorzio Apulo Lucano
Date:1982
Client: Studio Tecnico Dott. Ing. Lucio Santovito e C. S.n.C. (IT)
Consorzio di Bonifica Apulo Lucano: water resources assessment for irrigation purposes in Destra Ofanto. Detailed Design of intakes (area Lucana I°, II°, III° lots).
Italy
Enlargment of irrigation acqueduct of Consorzio per la Bonifica dell’Arneo
Date: 1982
Client: Studio Tecnico Dott. Ing. Lucio Santovito e C. S.n.C. (IT)
Enlargment works design of the acqueduct and groundwaters pumping plant at Sinfarosa – Strazzati.
Italy
Technical evaluation of water resources in Taranto Sud area
Date: 1981
Client: Studio Tecnico Dott. Ing. Lucio Santovito e C. S.n.C. (IT)
Consorzio per la Bonifica della Stornara e Tara: preliminary design for the exploitation of waste water at Taranto treatment plant for industrial purposes, irrigation, fish farm.
Italy
Improvemnet of Canale Palocco
Date: 1980 – 1987
Client: Studio Tecnico Dott. Ing. Lucio Santovito e C. S.n.C. (IT)
Consorzio di Bonifica di Ostia e Maccarese: preliminary design of improvement measures of Canale Palocco for collection of urban rain water system.
Italy
Wastewater treatment plant in Roma Sud
Date: 1980 – 1986
Client: Studio Tecnico Dott. Ing. Lucio Santovito e C. S.n.C. (IT)
Detailed Design and assistance during construction phase (Construction JV Astaldi-Cogefar).