SUDAN
Date: 2020 – on going
Client: Welthungerhilfe e.V.
The project is funded by the German Foreign Ministry (BMZ) to rehabilitate two earthen dams in Al Kuma and El Fasher rural localities in North Darfur State in collaboration with the national organization IRDS, to Improved food and nutrition security and resilience for returnees, IDPs and host communities
The study has included site investigation, soil study, hydrological analysis, geotechnical design, hydraulic design, socio–economic analysis, environmental studies, bills of quantities & tender documents for the rehabilitation of Al Kuma Irrigation Scheme and Um Maraheek Water Supply Scheme in North Darfur.
Date: 2020 – on going
Client: World Vision Deutschland e.V.
Technical Assistance to the review of Pre-Feasibility Study, preparation of Tender Documents and Project implementation
Date: 2018
Client: COOPI International Cooperation (IT)
Feasibility Study, Detailed Design, B.O.Q., Tender Documents of small earth dam in North Darfur.
Date: 2018
Client: COOPI International Cooperation (IT)
Description : Feasibility Study, Detailed Design, B.O.Q., Tender Documents of small earth dam in North Darfur.
Date: 2018
Client: COOPI International Cooperation (IT)
Bids evaluation activities.
Date: 2018
Client: JV Techniplan International Consulting (IT) – Bannaga Consulting (SUD) on behalf of the Ministry of Infrastructure and Transportation – Khartoum State Sanitary Corporation (SUD)
Review of the Baseline Surveys, review of the Wastewater Generation Analysis, review of the Analysis of current water consumption, review of the Assessment of Groundwater Pollution, diagnostic review of Stakeholder requirements, insight in Current and Future Demands, screening of options for optimal choice, implementation strategy, Feasibility Study and reports.
Date: 2017 – 2018
Client: JV Techniplan International Consulting (IT) – Bannaga Consulting (SUD) on behalf of the Ministry of Water Resources, Irrigation and Energy (SUD)
Review and Update of 14 Technical Guidelines and Workshops in the States.
Sector: BUILDINGS
Date: 2003 – 2004
Client: VECO Engineering
Description: Preliminary design of Melut Oil Base Camp, serving approx. 1200 people, including buildings, roads, water supply, sewer, fire fighting, security and ancillary works