FRANCE
Date: 2016
Client: Patscheider & Partner Engineers (IT) on behalf of Green City Energy AG (D)
Due Diligence of run-of river HPP Loubejac on Aveyron river (L’Honor de Cos Province): 2 Francis turbines, 200 kW + 260 kW, max discharge 17 m3/s: hydrological study, refurbishment works design review, production estimate, B.o.Q. and cost estimate.