SERBIA
Sector: HYDRAULICS WATER SUPPLY AND WASTE WATER
Date: 2003 2005
Client: Municiplity of Obrenovac
Description: Feasibility Study for rehabilitation of existing water supply network, 850 km, intake from Sava River, and existing waste water network, 150 km, covering an area of over 40.000 ha with 80.000 inhabitants. Pipes of various diameters. Proposal for Bank Financing