SYRIA
Sector: HYDRAULICS – IRRIGATION
Date: 1984
Client: GOEDEB (General Organisation for the Exploitation and Development of the Euphrates Basin)
Description: Feasibility Study of the irrigation scheme (6,000 ha sprinkler irrigation); Detailed Design of Acsad Salamiya scheme (1,300 ha gravity irrigation); Detailed Design of Maskanek scheme (3,500 ha sprinkler irrigation)