NIGERIA

hydraulics

Sector: HYDRAULICS – IRRIGATION

Date: 1986

Client: Finesport / AfDB

Description: Detailed Design of 1200 ha tea irrigated areas

Sector: HYDRAULICS – IRRIGATION

Date: 1985

Client: A.L.T.S.

Description: Detailed Design of 1000 ha rice irrigated areas on Yobe River. Feasibility Study for additional 6000 ha irrigated

Sector: HYDRAULICS – IRRIGATION

Date: 1985

Client: Agritech S.p.A.

Description: Detailed design of 600 ha irrigated of the pilot scheme Agritech

Sector: POWER PLANTS

 Date: 1985- 1987

Client: N.E.P.A. – ALTS – Ministry of Natural Resources

Description: Detailed Design of heat plants serving Kirenowa and Baga areas (2 x 70 MW each) at Lake Chad

Sector: HYDRAULICS – IRRIGATION

 Date: 1985 – 1986

Client: Ministry of Natural Resources

Description: Feasibility Study and Final Design of Alau Dam, Maiduguri – Borno State

Sector: HYDRAULICS – IRRIGATION

Date: 1985

Client: CBDA (Chad Basin Development Authority)

Description: Detailed Design of electric plant and transmission lines, 300 km of rural roads connecting to the polder area, 15.000 ha gravity irrigated schemes, drainage network and pumping stations, 5.000 ha drop irrigated schemes and channels network

Sector: HYDRAULICS – IRRIGATION

 Date: 1985

Client: CBDA (Chad Basin Development Authority)

Description: Detailed Design of Kirenowa Polder houses and primary infrastructures

Sector: HYDRAULICS – IRRIGATION

 Date: 1984 – 1987

Client: CBDA (Chad Basin Development Authority)

Description: Feasibility Study of 6000 ha rice irrigated areas close to Maidouguri

Sector: HYDRAULICS – IRRIGATION

Date: 1983 – 1987

Client: CBDA (Chad Basin Development Authority)

Description: Development of Baga Polder area (BP/BDF-I), approx. 20,000 ha irrigated at Lake Chad, and 500 ha pilot scheme. Preliminary and Detailed Design, Supervision of Works of the electric plant and SCADA system (BP/2-D); electric network and control system for the entire scheme (5.000 ha)

Sector: HYDRAULICS – WATER SUPPLY

Date: 1982 – 1984

Client: Gongola State Water Board

Description: feasibility Study, Detailed Design and Tender Docs, Supervision of Works of Gembu water supply (10.000 inhab.) at 1.400 m o.s.l.

Sector: HYDRAULICS – IRRIGATION

Date: 1980 – 1984

Client: CBDA (Chad Basin Development Authority)

Description: Detailed Design and Supervision of Works of Baga Polder on Lake Chad (dam 43 km long)