RWANDA
Date: December 2022 – May 2023
Client: Energy Development Corporation Ltd (EDCL)
Rwanda Energy Group (REG) through Energy Development Corporation Limited (EDCL) in partnership with Rwanda Government, MINECOFIN provided resources to conduct design of repair works, supervision, and implementation of the project. Nyabarongo HPP Rehabilitation seeks to solve the issues caused by heavy rain.
Sector : HPP
Date: 2020 – on going
Client: RWANDA AGRICULTURE AND ANIMAL RESOURCES DEVELOPMENT BOARD
The objective of this project is to rehabilitate Rurambi dyke and related irrigation structures and access road to make the scheme of Rurambi more productive. Rurambi Dyke is 9.25 km long and 2.5 m height, located between Masaka Sector, Kicukiro District and Mwogo Sector, Bugesera District. It was constructed mainly to protect Rurambi wetland from being flooded by Akagera River in order to develop agriculture in the wetland.
The works envisaged include: raising of the dyke (earth embankment) 1.2 m height maximum and rehabilitate related irrigation structures (primary canal sections) and access road.
Sector : Irrigation / Water Supply
Date: 2018 – on going
Client: WASAC Ltd (RWA) (funding AfDB)
Feasibility and detailed studies, Technical and Management framework, preparation of the tender document, Environmental and Social Impact Assessment ESIA report for rehabilitation and upgrading the public semi-centralized sewerage systems in Kigali with its Environmental Management Plan (EMP) with issuance of ESIA Certificate from Rwanda Development Board (RDB), supervision of works for rehabilitation and upgrading of semi centralized sewerage systems and WWTPs in 15 Kigali Estates.
Sector: ELECTRIC PLANTS
Date: 1989
Client: Electrogaz Kigali
Description: Survey of electric line Musha-Cimbazy and hydraulic equipment of the pumping station of the water supply of Bugesera